Plant connectivity
Getting data out of controllers, drives and instruments that were never specified to share it.
- OPC UA and Modbus TCP gateways
- Protocol conversion for legacy equipment
- Edge devices at the panel
Plant data is useful only once somebody acts on it. We connect the controllers, instruments and drives already in your plant, then put the numbers where your team will actually look.
The dashboard is the easy part. What sinks these projects is the layer underneath: a tag that was never scaled, a drive that reports in the wrong units, a historian logging at a rate that hides the event you were looking for.
We come at IIoT from the control side. The same engineers who write the PLC logic and check the loops set up the data collection, which means the numbers on the dashboard mean what you think they mean.
We are not selling you a platform. If your plant already has one, we will connect to it. If it does not, we will tell you honestly whether you need one yet.
Each one stands on its own. You do not need a plant-wide programme to start.
Getting data out of controllers, drives and instruments that were never specified to share it.
Logging at a rate and resolution that still answers the question six months later.
Screens built for a shift engineer, not for a boardroom slide nobody opens twice.
Visibility of unmanned assets, and alarms that reach a person rather than a screen nobody is watching.
Using what the drives and instruments already report to catch failures in a service window.
Connecting the plant without exposing it. The control network stays a control network.
Each layer only works if the one below it is right. We build from the field upwards, which is why we start by asking about your instruments rather than your dashboard.
The IIoT projects that work start with a specific question somebody in the plant wants answered: why does line two lose an hour every Tuesday, which motor is drawing more than it did last quarter, how much steam does a grade change actually cost. Pick one, instrument it properly, and the business case for the next one writes itself. Projects that start with a platform purchase usually end with an unused licence.
None of these need a new control system. They need the one you have to start reporting properly.
Stoppage reasons captured automatically rather than written on a clipboard, so the Pareto chart in your morning meeting reflects what actually happened.
Current and temperature trends from drives you already own, surfaced early enough to replace a bearing in a service window instead of a shutdown.
Consumption tied to output rather than to a monthly bill, which is the only form in which an energy number is actionable on the plant floor.
We would rather tell you to wait than sell you a project that sits unused. Here is roughly how we judge it on a first call.
Get an honest readSend us one question you cannot answer today. We will tell you what it would take to answer it, and whether it is worth doing.